Der letzte Postillon vom St. Gotthard

The title means "The last postillion (stage-coachman) of the St.Gotthard-pass". A company of select people joins the horse-driven coach for crossing the center of the Alps over the traditional path high on the mountain valley. It is the time of railways as the means of modernization. A tunnel is going to be built. The new fast way would render useless the small transport industry from which local people had made their living. The great mountainous landscape is the background for the conflicts which arise between rich and poor, local traditionalists and foreign modernizers. The daughter of a local, who is opposed against the tunnel, would like to get engaged with a tunnel engineer, but is also coveted by a local favored by her father.

Format
Movie
Episodes
1
Episode Duration
82 mins
Status
Finished
All details and tags
★90% Average★2 Users

Details

Type
Movie
Format
Movie
Episodes
1
Episode Duration
82 mins
Status
Finished
Start Date
Nov 8, 1941
Season
1941
Average Score
90%
Mean Score
90%
Ratings
2
Popularity
2
Favorites
0
Reviews
0
Genres
Drama
Country
CH

Description

The title means "The last postillion (stage-coachman) of the St.Gotthard-pass". A company of select people joins the horse-driven coach for crossing the center of the Alps over the traditional path high on the mountain valley. It is the time of railways as the means of modernization. A tunnel is going to be built. The new fast way would render useless the small transport industry from which local people had made their living. The great mountainous landscape is the background for the conflicts which arise between rich and poor, local traditionalists and foreign modernizers. The daughter of a local, who is opposed against the tunnel, would like to get engaged with a tunnel engineer, but is also coveted by a local favored by her father.

Immersion

Japanese

Characters

Staff

Recommendations

No recommendations yet. Add the first one.